Download Print this page

Sealey FWB1.V3 Instructions page 2

Advertisement

Align the crossbars (4) with holes in legs and insert bolts (9) from the
outside and fix with washers (13) and nuts (10).
Push the plastic feet (6) onto the leg ends ensuring the longest side
of the foot corresponds with the outer corner of the leg point.
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be
sorted, taken to a recycling centre and disposed of in a manner which is compatible with the environment.
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
ImPORTANT: No liability is accepted for incorrect use of this product.
wARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
INfORmATION: For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
© Jack Sealey Limited
STEP 3
Environmental Protection
Sole Uk Distributor, Sealey group,
Kempson Way, Suffolk Business Park,
Bury St. Edmunds, Suffolk,
IP32 7AR
Original Language Version
STEP 4
Fix chock (12) in suitable holes located in worktop as required.
01284 757500
01284 703534
www.sealey.co.uk
sales@sealey.co.uk
FWB1.V3
Issue No:1 - 06/05/14

Advertisement

loading