Sys-Operation; Volume - Honeywell X-618 Operation Manual

Public address and voice alarm system
Hide thumbs Also See for X-618:
Table of Contents

Advertisement

Note:
The device does not support the monitor function for X-DCS2000 zones.

Sys-operation

Users can handle relevant system fault operations via the device, such as reset, ACK and lamp
test.
Reset is used to reset the fault status of current device and its managed devices. Click the button
to reset, if the fault is still exist, device will display the fault again.
When there is a fault, the buzzer of the device and the managed devices will ring and the fault
indicator will flash. Click "ACK" to mute and the indicator won't flash.
Lamp test is used to control the lamp test of the devices in one group. Under the lamp test, the
buzzer will ring till the "Lamp Test" button is pressed, or it will stop testing after one minute.

Volume

Device can adjust the volume of itself and the configured zones. Click "Volume" to enter below
interface, displaying the volume of local, lines and groups.
Click "Local" and drag the relevant dot to adjust the volume of microphone, loudspeaker, line in
and line out. The current volume is displayed.
Sys-operation Interface
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents