Page 1
PC - CENTRIFUGAL SUMP PUMPS INSTRUCTION for INSTALLATION, OPERATION & MAINTENANCE...
Page 2
Instructions for Installation, Operation and Maintenance Standart Pompa ve Makina San. Tic. A. . All rights reserved. Can not be copied or reproduced for any purpose without permission. Subject in the manual can be changed without any prior notice.
- If the pump is to be used for a di erent application please contact sales o ce or representative of the manufacturer. STANDART POMPA refuses to assume any responsibility if the pump used for di erent applications without prior written permission.
Page 4
•PC-V c i t i r t Applications PC-V series pumps are suitable for sewage or dirty and temperatures up to 90ºC. The main application areas, among others, are: • Ge neral waste water supply, irrigation, • Pressurized water supply, •...
Page 5
Carefully remove the packaging material and check that pump and accessories (if any) are free from any markings, stretches and damages, which may have occurred during transportation. In the event of damage report this immediately to STANDART POMPA’s service department and to the transport company.
Page 6
B3- Storage If the pump is not to be installed and operated soon after arrival, store the pump in a clean, dry and frost- free place with moderate changes in ambient temperature. If the pump has regreaseable bearings, pump extra grease on bearings to prevent moisture from entering around the shaft.
Page 7
C4- Connecting The Piping C4.1- General Never use the pump as an anchorage point or as a carrier for the piping. ATTENTION The pipes should be supported very near the pump . It must be checked that any weight, stress or strains on the piping system should not be transmitted to the pump.
Page 8
C4.4 If there is a possibility of the pump havi ng to operate a t zero ow ( agains t a closed disc harge valve) or nea r the closed valve with almos t no ow, then a minimum ow valve (or a by-pass check valve) must be installed on the disc harge nozzle or on the dischar ge piping right after the pump but before the ow re gulating valve.
Page 9
ATTENTION In the case of three-phase induction motors with Y – – connection it must be ensured that Longer change-over the change-over points between star and delta follow on from one another very quickly. times may result in pump damage . Motor Power Y - set time <...
Page 10
D3- Shut Down The Pump Slowly close the shut-o valve in the discharge line. You may shut down the pump without closing the shut-o valve if there is a device for water hammer protection on the discharge line or the water hammer is not a considerable level. Switch o he driver.
Page 11
F- DISASEMBLY, REPAIR AND REASSEMBLY F1- Disassembly section M Remark shaft. F2- REASSEMBLY Reassemble in accordance with standard engineering practice. You may find the attached drawings useful. Clean all the parts, replace damaged or worn-out ones. Coat the seats and screw connections with graphite, silicon or similar slippery substance before assembly. If you can not find any of the above you may use oil instead (except the pumps for drinking water).
Page 12
G- SPARE PARTS PC-V (PC-V 150 - 315) Pump Type and Size Motor power and Speed (15 kW - 1500 rpm) Prod. Year and Serial Number (..- ..) (..- ..) Capacity and Head Number of pumps in the system Part Part Name 049.1, 049.2...
Page 13
REMEDIES POSSIBLE CAUSES Fill pump and suction pipe completely with liquid and repeat the priming There may be air existing in pump or procedure. suction pipe Check for leaks in suction pipe joints and ttings. Check shaft seal if Ingress of air through shaft seal, necessary increase the pressure of sealing liquid.
Page 14
I- TIGHTENING TORQUES Tightening Torques Tightening Torque max (N.m) Thread Diameter Property Classes 10.9 1050 1100 1550 1450 2100 1970 2770 2530 3560 J- EXPECTED NOISE VALUES Sound pressure level (dB Power of Motor (Pump with motor) (kW) 1450 rpm 2900 rpm <...
EC DECLARATION OF CONFORMITY Products: PC-V Manufacturer: Standart Pompa ve Makina San. Tic. A.Ş. Machinery Directive 2006/42/EC and Low Voltage Directive 2006/95/EC. MANUFACTURER DECLARATION OF CONFORMITY Products: PC-V Machinery Directive 2006/42/EC.
Page 17
Factory - Center Service and Spare Parts Organize Sanayi Bölgesi Organize Sanayi Bölgesi 2.Cad. No:9 34775 2.Cad. No:9 34775 İstanbul - TÜRKİYE İstanbul - TÜRKİYE Pbx: +90 216 466 89 00 Pbx: +90 216 466 89 00 Fax: +90 216 415 88 60 Fax: +90 216 466 89 13 Right reserved to change without notice.
Need help?
Do you have a question about the PC-V Series and is the answer not in the manual?
Questions and answers