Download Print this page

Baoding Shenchen YZ35 Manual page 8

Pump head

Advertisement

Shenchen Pump
After the external tube clamps on both sides are installed into the
groove, and the tube has been adjusted to make the outermost sides of
the tube clamp coincide with the marked line on the tube. Then press
down the upper block.
Pump Head Installation
Insert three screws into the pump head mounting hole respectively, then
insert the spindle nose of pump head into drive mounting hole, fasten
the screws respectively.
When using multiple pump heads, you need longer screws.
When using multiple pump heads, rollers need mount stagger.
Note: Users need to fasten the screws with similar force, and it should
not be too tight, to avoid the holder to deform and make working noise.
YZ35 Pressure Adjustment
Can adjust pressure by the rotary knob on pump head body, rotate with
the arrow direction, pressure enlarge, otherwise reduce.
When you adjust pressure, please loosen the hexagon socket fastening
screw in the middle of the knob, when you finished adjusting, then
tighten the screw.
YZ35-Aluminum Alloy Pump Head
- 5 -

Advertisement

loading