Download Print this page

Instructions - Baoding Shenchen YZ35 Manual

Pump head

Advertisement

Shenchen Pump
2.

Instructions

Upper block
Rollers
Mounting hole
Holder
Tube Installation
Pull the spanner anti-clockwise 180° to open the upper block.
Put the tube between rollers and upper block, then pull the tube front
and back to adjust it.
Pull the spanner clockwise 180° to put the upper block in place, the
clamp will lock the tube and keep the tube from moving when the pump
head is working.
External Tube Clamp Installation
The external tube clamp can reduce the vibration at the tube outlet. In
addition, it effectively prevents the wear phenomenon caused by the
angled tilt of the tube outlet during the customer use.
YZ35-Aluminum Alloy Pump Head
Rotary knob
- 2 -
body
spanner
Tube clamp

Advertisement

loading