Figure 2 — A Typical Installation Diagram for Power Management System
Relay Board
Load
Connection
Wireways
Generator
Connection
To Transfer Switch
System Setup
You must perform the following before operating the system:
• Place the 2 position sliding switch on the control module
in the NG or LP position (Figure 3), whichever is
appropriate for the installed home standby system.
• Place the 3 position sliding switch on the control module
to match the rating of the home standby system (Figure 3).
• In main breaker panel, turn selected load circuit breakers
to the ON position.
IMPORTANT: After installation of the power
management system is complete, turn on utility power to
the home standby generator and transfer switch.Wait one
minute before turning generator to AUTO.
INSTALLATION
To Air Conditioners
Figure 3 — Control Module
8
Green LED's
Controle
Module
Transfer Switch
Connections
Air Conditioner
Relays
Air Conditioner
Connections
Ground Lug
2 Position
3 Position
Switch
Switch