SARAD GmbH
10
Measurement
The measurement starts autonomously after replacing the batteries or connecting the main power
supply. The first measurement result will be available as soon as the first sampling interval is
accomplished. Newly acquired values will be appended periodically to the previously stored results.
The measurement cannot be stopped by the user.
Each year the voltage of the batteries should be checked. This can be done e.g.: by using Radon
Vision software and USB connection. Older data in the memory, which are no more needed, can also
be deleted by means of the software.
Radon activity above alarm threshold value (which is settable) will be indicated by LEDs at the front
panel (fig. 1.). Simultaneously the alert switch will be activated. Please refer to the chapters: „LED
indicators" and „Alert Switch".
Manual_Smart-Radon-Sensor_EN_12-03-2020.docx
Need help?
Do you have a question about the Smart Radon Sensor and is the answer not in the manual?