First Lighting - Palazzetti ECOMONOBLOCCO MX Installation And Maintenance Manual

Hide thumbs Also See for ECOMONOBLOCCO MX:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 20
2) Insert the lower deflector (c) and position it
resting it on the brackets (D and E) (Fig. 27).
D
3) Proceed in the same way on the opposite side.
4) Reposition the fire pit, the grate support, the
grate and the combustion air deflector, being
sure not to damage the refractory panels.
The three circular holes in the grate
support must be positioned as shown
in Fig. 28.
34

6.5 First lighting

Arrange for the installer to perform the
"first lighting".
Before commissioning, remove the
E
stickers and packaging inside the fire
box and the external stickers applied to
the glass.
The first lighting operation is a fundamental op-
eration, used to test the product in full function,
and to gradually evaporate the water used in the
construction mixtures, which will make it resist-
ant and long-lasting.
C
First lighting must be carried out with
reduced loads (approximately 2 kg/h),
keeping the appliance on for at least
4 hours at low speeds. Proceed with
these feed rates for at least three days
before using the appliance at its full
capacity. This will allow for the evap-
Fig. 27
oration of any moisture accumulated
in the refractory elements when not
used.
During first lighting of the product, unpleasant
odours or fumes may be generated caused by
the evaporation or drying of certain materials
used and water may leak from the grout. This
phenomenon will gradually disappear.
For this reason during the first lighting it is rec-
ommended to maintain the premises well airy.
Fig. 28
004778411 - 18/09/2020

Advertisement

Table of Contents
loading

Table of Contents