2
Tools Required
The following tools and items are required to carry out the installation of the doorset.
•
Spirit level
•
Power Drill
•
Screwdriver or Power driver
•
Measuring tape
(Determined by the size of the fixings used.)
3
Storage
Any shrink wrapping or other protective packaging
should be kept in place as long as possible.
Unglazed and unfinished, windows should be stored
under cover, preferably inside a building. If they are
stored outside they should be kept clear of the ground
on level bearers and protected from dampness and
sunlight with a tarpaulin. Polythene sheets should not
be used as this can act as a greenhouse and encourage
hot, humid conditions. There should be space for air to
circulate around the windows. Factory finished and/or
glazed windows need extra care to avoid damage to the
painted surfaces or glass.
4
What you receive
The Windows are delivered on a pallet, check quantities
on your delivery ticket are the same as those on the
pallet.
If there are any items missing phone JELD-WEN on:
0845 122 2893
Window handles and fixings supplied loose attached to
head of the window, if not already fitted to sash.
4
JWW3203_18708_Stormsure Energy+_Fit_instruct_A5.indd 4
JWW3203_18708_Stormsure Energy+_Fit_instruct_A5.indd 4
•
Appropriate Silicone sealant
•
Mallet – Rubber headed
•
Screw head bit
•
Masonry Drill bit
They should be stored vertically to prevent water
accumulating on top of the glazing units.
When being removed from storage windows should
be lifted, not dragged. They should be lifted by the
main frame and carried in a vertical position to avoid
distortion.
09/02/2021 11:52
09/02/2021 11:52