Gen24 Inverter: Connecting The Rapid Shutdown Box To An Emergency Stop Button - Fronius Rapid Shutdown Box Duo Installation Instructions Manual

Balance of system
Hide thumbs Also See for Rapid Shutdown Box Duo:
Table of Contents

Advertisement

Available languages

Available languages

GEN24 inverter:
Connecting the
Rapid Shutdown
Box to an emer-
gency stop but-
ton
Connecting the
ATTENTION! ?
Rapid Shutdown
Box to a Fronius
Wiring schemes show best practice examples assuming that more than two PV
strings connected in parallel require overcurrent protection (e.
Primo 10.0 / 11.4 /
12.5 / 15.0
g. fusing). Refer to Primo installation manual regarding multi conductor wiring and fusing
details
If multiple strings are connected to an MPP tracker, the string voltages should be as
equal as possible in order to avoid power losses.
Connecting 4 Solar Module Strings to the Fronius Primo 10.0 / 11.4 / 12.5 / 15.0
20
Emergency Switch Stop
Connecting to external emergency
stop:
If an external emergency stop is required,
it can be installed anywhere in the signal
line. When the connected emergency stop
button is pressed, the Rapid Shutdown is
started and the PV field is disconnected in
the Rapid Shutdown box. As soon as the
emergency stop button is returned to its
original position, the PV field is reconnec-
ted.
Requirements for external emergency
stop:
-
Maximum switching load: 30 V DC / 5
mA
-
Nominal voltage between contacts
and housing: 600 V DC
RSB Quattro

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rapid shutdown box quattro

Table of Contents