Brigstock Road, Wisbech PE13 3JJ
TOOLS REQUIRED
Hammer
●
Step ladder
●
Sand paper
●
Battery-powered drill/screwdriver
●
8mm drill
●
Pencil
●
Tape measure
●
Gloves
●
Sharp knife and saw
●
IMPORTANT!
PLEASE READ PRIOR TO ASSEMBLY OF
THE BUILDING
EVERY PRECAUTION IS TAKEN TO
ENSURE THAT YOUR BUILDING HAS NO
ELEMENT INCORRECTLY PLACED OR
POSSIBLY HAZARDOUS, HOWEVER
PRIOR TO USE PLEASE CHECK ALL
SURFACES FOR THE FOLLOWING:
1 RAISED GRAIN, SPLINTERS: sand
down timber to smooth finish
2 NAIL/SCREW/PIN HEADS PROUD: tap
home to be flush with surface of timber
3 DAMAGED SCREW HEADS
RESULTING IN SHARP SPLINTERS OF
METAL: replace
4 SHARP ENDS OF NAILS/ SCREWS/
PINS PROTRUDING THROUGH THE
PANEL: remove and reposition.
5 ENSURE ALL PARTS ARE SECURED
AGAINST REASONABLE FORCE:
remove and refit
6 ENSURE THERE ARE NO LOOSE
PARTS: remove and refit/discard
We recommend that protective
gloves be worn throughout
PLEASE NOTE
Wood is a natural product and is therefore
prone to changes in appearance, including
some warping, movement and splitting,
particularly during unusual climatic conditions
(long hot or wet spells of weather). As a natural
occurrence this is not covered by a guarantee.
Assembly of FP Loft 2015
Adult Assembly Only - do not attempt to modify this building
Thank you and congratulations on the purchase of your Shire garden building.
We believe that this product will give you many years of excellent service. This
is a natural product manufactured to a high standard therefore if you have any
queries or experience any difficulties then please contact our customer service
hotline on 01945 465 295. Normal office hours: 8.30 am to 5.00 pm Monday to
Friday.
Preparation of base
We recommend that the base onto which your building will stand should be at least
75mm larger in each direction than the total floor size of the building.
Actual floor area of the building: 2390x1790 (8'x6')
Total height clearance: 2463mm
The chosen position in your garden for the siting of the building should be
excavated to a depth of 75mm to allow a base of sand, on to which paving slabs
can be evenly laid - THEY MUST BE LEVEL AND FIRM.
Treatment/care of your Garden Building
Treat with a suitable decorative wood finish immediately. We recommend that all
timber pieces be treated again prior to assembly and again within 3 months of
assembly. We further recommend that all pieces are treated again at least annually
or as frequently as the instructions on the product used recommends.
We would suggest that all wall panels be treated in an upside-down position to
allow the finish/treatment to ingress into the tongue and groove jointing.
We would also remind you that you would rarely (if ever) be able to re-treat the
underside of the floor following assembly. We strongly recommend that the
underside of the floor is treated an absolute minimum of twice (not including
pre-treatment).
Garden buildings are not waterproof, therefore on assembling building we
recommend using a silicon based sealant between wall panels and between
wall panels and floor.
Parts List
QTY
DESCRIPTION
16
Glazing 202 x202mm
1
Door glazing 150X150mm
66
Beading 204mm
4
Door beading 35x35x100
4
Cover strips 1710mm
2
Fascia 1775mm
straight & wavy
2
Fascia 1079mm
straight & wavy
1
Balustrade railing
1
Ladder
2
Profiled diamonds
8
520mm shutters
2
Window boxes
36
60mm screws
20
25mm screws
4
25mm black screws
6
10mm black screws
38
40mm nails
8
20mm screws
170
Felt nails
64
Panel pins
9
Angled brackets
3
False hinges
1
Ring handle
1
Roller catch
1
Wood block - (roller catch)
2
Vents
3
Felt 2.2m x 1m