Starting Locomotive Operation; Prior To Initial Commissioning; Running The Model In; Operating Instructions - roco BR 10 002 Manual

Table of Contents

Advertisement

Available languages

Available languages

▪ Prior to initial commissioning

▪ Running the model in

During the �rst �ve minutes the locomotive should run at medium speed.

▪ Operating instructions

The smallest radius this model should run is R3.Your locomotive will run smoothly on clean tracks only.
For this purpose we recommend using item no. 46400, Roco track cleaning rubber, for removing heavy
dirt.

▪Fittings

Only for showcase
Use glue
only if
indicated!
Otional
8062192920.indd 19

Starting locomotive operation

In order to prevent poor running characteristics
or damage from occurring, the coupling rod be-
arings on your locomotive must be oiled prior
to undertaking the initial commissioning. We re-
commend using the ROCO oiler 10906
Operation is possible with di�erent couplings. We
recommend using the Roco close coupling.
In the enclosed accessory bag you will �nd small
kits to be �tted on your locomotive. please mount
them cautiously.
19
19
23.04.2012 08:11:57

Advertisement

Table of Contents
loading

This manual is also suitable for:

621926219368193

Table of Contents