Operating Position; Preparing The Boiler; Boring The Boiler Plate - Riello RS 55/M BLU Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

Available languages

Available languages

5.4

Operating position

 The burner is designed to operate only in
positions 1, 2, 3 and 4 (Fig. 7).
 Installation 1 is preferable, as it is the only
WARNING
one that allows the maintenance operations
as described in this manual.
 Installations 2, 3 and 4 permit operation but
make maintenance and inspection of the
combustion head more difficult.
D3928
The standard equipment motor protection
1)(Fig. 8), must be fixed on the bracket 2) using
the appropriate screws 3) with nut and washer
before fitting the casing.
WARNING
Fix the bracket to the front shield of the burner
with screw 4).
5.5

Preparing the boiler

5.5.1

Boring the boiler plate

Pierce the closing plate of the combustion chamber, as in Fig. 9.
The position of the threaded holes can be marked using the ther-
mal insulation screen supplied with the burner.
Installation
1
2
 Any other position could compromise the cor-
rect operation of the appliance.
 Installation 5 is prohibited for safety reasons.
DANGER
3
4
D7648
mm
RS 55/M BLU
13
GB
5
2
1
4
D455
A
B
195
275 - 325
Fig. 7
3
Fig. 8
Fig. 9
C
M12
Tab. F
20040559

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

832t20038459200384842003848220038486

Table of Contents