Water Drain; Final Checklist - Ice-O-Matic Gourmet UCG Series Installation And Service Manual

Hide thumbs Also See for Gourmet UCG Series:
Table of Contents

Advertisement

position between the water supply line and the unit. If water contains a high level of impurities, it is
advisable to consider the use of an appropriate water filter.

WATER DRAIN

The recommended drain tube is a plastic or flexible tube with ¾" (18mm) I.D. which runs to an open
trapped and vented drain.
NOTE: The water supply and the water drain must be
installed to conform with the local code. In some cases, a
licensed plumber and/or a plumbing permit is required.
The water can be pumped out up to 30m on horizontal length.
F.
FINAL CHECK LIST
1. Is the unit in a room where the ambient temperatures are within a minimum of 50˚F (10˚C)
even in winter months?
2. Is there at least a 6" (15cm) clearance around the unit for proper air circulation?
3. Is the unit level? (IMPORTANT)
4. Have all the electrical and plumbing connections been made, and is the water supply shut-off
valve open?
5. Has the voltage been tested and checked against the data plate rating?
6. Has the water supply pressure been checked to ensure a water pressure of at least 14 psi (1
bar)?
7. Check all refrigerant lines and conduit lines to guard against vibrations and possible failure.
8. Have the bolts holding the compressor down been checked to ensure that the compressor is
snugly fitted onto the mounting pads?
9. Have the bin liner and cabinet been wiped clean?
UCG GOURMET SERIES UNDERCOUNTER
pg. 5

Advertisement

Table of Contents
loading

Table of Contents