At restart, from tripping OFF at bin full, the new PC Board assures 45 seconds
water fill phase to refill the water sump up to the maximum level.
On the PC Board there are four jumpers to select:
•
0 or 12 months remind time for the water system cleaning
•
Operation of the purge out water pump
•
"No delay" or 60 minutes delay time at first start up
TEST
•
In case the TEST contacts are closed with the jumper, at the start up of the
machine, the PC Board energizes all the electrical components for a maximum of
3 minutes.
At the end of the 3 minutes, the PC Board switches OFF the entire machine with
the blinking of all the LEDs as shown on the drawing below.
e. Push Button Operation
During water filling phase:
When pushed for more than 2 seconds but less than 5 seconds, the machine
•
enters in Cleaning Mode
When pushed for more than 5 seconds, the machine will by-pass the water
•
fill phase
During freeze/harvest cycle:
When pushed for more than 5 seconds during the freeze cycle, the machine
•
goes immediately into harvest
When pushed for more than 5 seconds during the harvest cycle, the machine
•
enters immediately in the freeze cycle
UCG GOURMET SERIES UNDERCOUNTER
pg. 19