Before You Begin Installation
Review the following sections before you begin installing the luminaire.
Power Disconnect Device
Before installation, make sure that you have a readily accessible input
power disconnect device installed ahead of your Navis 100 and the driver.
WARNING:
power disconnect device cannot be serviced or operated
safely.
AVERTISSEMENT :
les circuits installés sans qu'un dispositif de déconnexion de
l'alimentation ne soit accessible.
Installation Requirements
Ambient operating temperature 0–40°C (32–100°F), 5–95%
•
non-condensing humidity.
Maximum operating temperature 80°C (176°F). Luminaire turns off
•
if the operating temperature exceeds the maximum temperature.
Dry locations only.
•
IP20 rated.
•
Suitable for use in air handling spaces.
•
Installation location must support the weight of the luminaire and
•
applicable mounting hardware.
Navis 100 RGBW luminaires require 0.31 m (12 in) minimum
•
spacing for the following:
center-to-center of adjacent luminaires
-
center of luminaire to side building member
-
Wiring the Luminaires
Luminaire power and data in and out cables terminate to RJ45
connectors. You must use 0.25 mm
conductors in Category-type cable terminated to the T568B standard. You
can connect up to four luminaires along one run of cable when using the
RJ45 output from a driver card. The total cable distance for each wiring
run should not exceed 100 m (328 ft).
Note:
Do not mix White, Fade to Warm, and RGBW luminaires in the
same wiring run.
6
Circuits that are installed without an accessible
Il est imprudent d'utiliser ou de réparer
Connect only the same types of luminaires in a wiring run.
2
(23 AWG) or larger gauge
Navis 100 Installation Guide