Connection Cabinet - ferroamp EnergyHub XL Installation And User Manual

System
Hide thumbs Also See for EnergyHub XL:
Table of Contents

Advertisement

3 Connection cabinet

• Connect the three-phase cable to the marked terminals in the cabinet.
• There are built-in circuit breakers in the cabinet to every EnergyHub XL.
The current in the neutral conductor to the EnergyHub can get up to 1.7 times larger
than the rated current at full current equalization.
• It is recommended to install a circuit breaker for the whole cabinet.
6

Advertisement

Table of Contents
loading

Table of Contents