Download Print this page

Huawei SUN2000-25KTL Installation Manual page 5

Solar on grid string inverter
Hide thumbs Also See for SUN2000-25KTL:

Advertisement

TRACKSO WORKING
1. Insure correct connections as detailed in the installation guide.
2. Insert the SIM card.
3. Switch on the power to the TrackSo device. (Minimum 12V/1A input is required)
4. Power LED (Red) of TrackSo IoT gateway glows and stays ON.
NOTE: TrackSo IoT Gateway will only be able to send data if the GPRS network is available at the installed location.
LED
NAME
GREEN
RED
GREEN
YELLOW
DESCRIPTION
POWER
Light when Power on the device
LED Status
Flashing (ON for 100ms and OFF for
100ms)
Flashing (ON for 500ms and OFF for
500ms)
GSM
Flashing (ON for 0.1s and OFF for 2.9s)
Once at every 3sec
Flashing twice at every 3sec
Flashing 5times
LED OFF
COM TX
Blink on data transmission in RS485 port
COM RX
Blink on data reception in RS485 port
Connection State
SIM Card not found
Searching for GSM Network
GSM Network Registered
GPRS IP Connected
GPRS IP Sending data
GSM Fault

Advertisement

loading

This manual is also suitable for:

Sun2000-30ktlSun2000-33ktlSun2000-36ktlSun2000-55ktlSun2000-60ktlSun2000-40ktl