Download Print this page

Larson Electronics SPLT-1.59K-800A-30-4X100W-LED-MS Installation Manual page 2

Solar power generator with pneumatic light tower

Advertisement

OPERATION MANUAL
Solar Power Generator with Pneumatic Light Tower Mast
Part# SPLT-1.59K-800A-30-4X100W-LED-MS
READ BEFORE OPERATING OR DEPLOYING!
Read these instructions carefully BEFORE attempting to operate or deploy
the solar powered trailer. Failure to comply with instructions and guidelines
could result in serious or fatal injury, as well as void any warranty. Retain
these instructions for future reference.
DEPLOYING TRAILER
1.
Choose a location that is close to level as possible to position the
trailer. When picking a location, ensure the mast is free and clear from
any overhead obstructions.
Drop the trailer from the tow vehicle using the single jack located on
the front of the trailer. Ensure the safety chains and cable have been
disconnected from the tow vehicle.
SPLT-1.59K-800A-30-4X100W-LED-MS
2.
Once the trailer has been disconnected from the
hitch of the tow vehicle, extend the remaining jacks.
There are (2) leveling jacks located on the back
and (2) jacks located on the front of the trailer. Pull
the pin on the side of the jack to rotate it 90° toward
the ground and hand crank the jack clockwise to
extend it.
Use a bubble level to ensure the trailer is level.
Ensure that the unit is completely level before
deploying!
The jacks can be extended outward by
loosening the hand screw, pulling the
jack/outrigger out and tightening hand screw.
3.
There are support plates holding each solar
panel in place for transport. Be sure to
disconnect these support plates prior to
deploying each solar panel array! Pull the support plate up and
push the solar panel out to free it. Repeat this process for the other
solar panel.
4.
You are now ready to deploy the solar panels.
Larson Electronics LLC
ver.0118-1
FRONT HITCH JACK
LEVELING JACK
HAND SCREW
SUPPORT PLATE
1

Advertisement

loading