3 .4 .1 Flow And Return Line Conversion; Actuator Conversion - Helios WHSH HE 24 V (0-10 V) L Installation And Operating Instructions Manual

Hydraulic unit with circulating pump and 3-way valve
Hide thumbs Also See for WHSH HE 24 V (0-10 V) L:
Table of Contents

Advertisement

Available languages

Available languages

Installation and Operating Instructions
EN
Hydraulic unit WHSH HE 24V (0-10 V) L
3 .4
Flow and return line conversion
With regard to the hydraulic unit, the flow line is on the right side when delivered.
Depending on the setup of the heating system, it is necessary to switch the flow and return line.
In order to switch the flow and return lines, the following three steps must be taken:
− Conversion of both lines
− Conversion of actuator
− Conversion of the 3-way mixing valve
These steps are described in detail in the following three sections .

3 .4 .1 Flow and return line conversion

Remove fitting group from the thermal insulation and remove the wall bracket.
Loosen union nuts on the 3-way mixing valve with a spanner SW66 and remove the mixer tap. Switch pump line and
flange pipe line (Fig. 8, Fig. 9).
Remove clamping part (9) from the lower shell, turn 180° and replace in the lower shell (Fig. 10).
9
3 .5

Actuator conversion

Actuator for mechanical operation of the
3-way mixing valve
1. Operating switch automatic/manual operation
2. Connection cable Power supply
3. Adapter for fixing to mixer plug
4. Flat-head screw
5. Serrated washer
6. Rotary handle with display function
7. Viewing panel red/blue
8. Hollow shaft
9. Rotation lock
Fig .8
Fig .10
6
Fig .9

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

06311

Table of Contents