Wall Installation - Helios WHSH HE 24 V (0-10 V) L Installation And Operating Instructions Manual

Hydraulic unit with circulating pump and 3-way valve
Hide thumbs Also See for WHSH HE 24 V (0-10 V) L:
Table of Contents

Advertisement

Available languages

Available languages

Installation and Operating Instructions
Hydraulic unit WHSH HE 24V (0-10 V) L
3 .3

Wall installation

The hydraulic unit fitting group is either installed to the wall or to a distribution beam or a hydraulic separator.
1. Upper shell
2. Insert block (two parts)
3. Hexagonal nut SW10
4. Locking plate
5. Fitting group
6. Wall bracket
7. Subshell
8. Spacer
9. Clamping part
Wall installation
1. Remove upper shell (1) (Fig. 5).
2. Remove insert block (two part) (2) (Fig. 5).
3. Loosen hexagonal nut (3) with SW10 and remove
locking plate (4) (Fig. 5).
4. Remove fitting group (5) and wall bracket (6) from
the lower shell (7) (Fig. 5).
5. Hold wall bracket (6) and lower shell (7) perpendicular
to the wall to use them as a drilling template (Fig. 6).
6. Mark drill holes, drill and insert provided dowels
(Fig. 6).
7. Mount wall bracket (6) to the wall with hexagonal
screws (SW12) (Fig. 7).
8. Place lower shell on wall bracket (Fig. 7).
9. Insert spacer (8) in lower drill hole in lower shell
and mount to wall with hexagonal screw (SW12)
(Fig. 7).
10. Insert fitting group (5) in lower shell (7),
fasten with locking plate (4) and hexagonal
nut (3) (Fig. 7).
11. Insert the insert block (two part) (2) (Fig. 7).
å The station is prepared for the piping and additional
connection work.
5
EN
Fig .5
Fig .6
Fig .7

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

06311

Table of Contents