Download Print this page
HP Z2 Mini G5 Product End-Of-Life Disassembly Instructions

HP Z2 Mini G5 Product End-Of-Life Disassembly Instructions

Advertisement

Quick Links

Product End-of-Life Disassembly Instructions
Product Category: Workstations
Marketing Name / Model
[List multiple models if applicable.]
HP Z2 Mini G5 Workstation
TPC-I046-DM-180
TPC-I046-DM-280
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the
disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive
2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
NOTE: Recyclers should sort plastic materials into resin streams for recycling based on the ISO 11469 plastic marking code on the
plastic part. For any questions on plastic marking, please contact
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries, excluding Li-Ion batteries.
Li-Ion batteries. Include all Li-Ion batteries if more than
one is provided with the product (such as a detachable
notebook keyboard battery, RTC coin cell, etc.)
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface greater than
100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring greater
than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
EL-MF877-00
Template Revision C
Last revalidation date 04-01-2018
Notes
With a surface greater than 10 sq cm
All types including standard alkaline, coin or button style
batteries
Battery(ies) are attached to the product by (check all
that apply with an "x" inside the "[ ]"):
[0 ] screws
[0 ] snaps
[
[
NOTE: Add detailed removal procedures including
required tools in the sections 3.1/3.2.
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps (15.6")
DC Cable for External Power Supply
HPI instructions for this template are available at
HP's Sustainability
Contact.
] adhesive
] other. Explain
EL-MF877-01
Quantity of
items
included in
product
6
1
0
0
0
0
0
0
1
0
Page 1

Advertisement

loading

Summary of Contents for HP Z2 Mini G5

  • Page 1 Product End-of-Life Disassembly Instructions Product Category: Workstations Marketing Name / Model [List multiple models if applicable.] HP Z2 Mini G5 Workstation TPC-I046-DM-180 TPC-I046-DM-280 Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Quantity of items Item Description Notes included in product Plastics containing Brominated Flame Retardants weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above) Components and parts containing toner and ink, Include the cartridges, print heads, tubes, vent including liquids, semi-liquids (gel/paste) and toner chambers, and service stations.
  • Page 3 EL-MF877-00 Page 3 Template Revision C Last revalidation date 04-01-2018 HPI instructions for this template are available at EL-MF877-01...
  • Page 4 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL :Ludao Ludao d is a s s e m b ly SOP Sub-assembly name: Ludao d is a s s e m b ly SO P Document No.: Z h o u . G u i l i n Written by: Revision: 0.20...
  • Page 5 Standard Operation Procedure 1(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble top cover Operation Name : Ver. : Edit date Step: 1. Press the detachable button to the right to pop out the top cover;(pic1) 2.Lift the top cover and take it out in the oblique direction;(pic2) Press the detachable button to the right Pic1 Lift the top cover and take it out in the oblique direction...
  • Page 6 Standard Operation Procedure 2(1/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble HDD Operation Name : Ver. : Edit date For HDD SKU Step: 1. Disassemble the HDD set screw*1(Pic1) the torque force of the driver is 2.5+/-0.2kgf.cm 2.Take out the HDD in the oblique direction(Pic2)...
  • Page 7 Standard Operation Procedure 2(2/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble HDD Operation Name : Ver. : Edit date For no HDD SKU Step: 1. Disassemble the HDD set screw*1(Pic1) the torque force of the driver is 2.5+/- 0.2kgf.cm 2.Take out the HDD in the oblique direction (Pic2)...
  • Page 8 Standard Operation Procedure 3(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble HDD screw Operation Name : Ver. : Edit date For HDD SKU Step: 1. Remove the side screws of the HDD set after putting it into the fixture(pic1) the torque force of the driver is 2.5+/- 0.2kgf.cm For no HDD SKU...
  • Page 9 Standard Operation Procedure 4(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble CPU fan、GPU fan Operation Name : Ver. : Edit date Step: 1. Lift the fan(pic1) 2. Take the fan connector.(pic2) 3. Take the fan(pic3) pic1 Tap the fan hook on either side pic2 pic3 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 10 Standard Operation Procedure 5(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble CPU/GPU thermal Operation Name : Ver. : Edit date Step: 1. Take CPU thermal module/GPU module screws (pic1/pic2); when taking the screw, align the driver head first and then turn the electric driver to prevent the main screw from sliding.
  • Page 11 Standard Operation Procedure 6(1/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble VGA/B Operation Name : Ver. : Edit date For 125W Step: 1.Take MXM screws,take MXM card (pic1) the torque force of the driver is 1.5+/- 0.2kgf.cm ...
  • Page 12 Standard Operation Procedure 6(2/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble Thermal sponge Operation Name : Ver. : Edit date For 65W Step: 1. Take sponge(pic1) For 125W 1. Take sponge(pic2) pic1 pic2 Notice: Please inform production line leader or master if you found any abnormal.. Fixture list (Spec.) Symbol manu...
  • Page 13 Standard Operation Procedure 7(1/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble serial/B Operation Name : Ver. : Edit date For serial/B SKU Step: 1. Disassemble serial/b screws*2 (pic1) the torque force of the driver is 1.5+/-0.2kgf.cm  when taking the screw, align the driver head first and then turn the electric driver 2.Take cable(pic2)...
  • Page 14 Standard Operation Procedure 7(2/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble USB/B Operation Name : Ver. : Edit date For USB/B SKU Step: 1. Take USB/B set screws*2(pic1)  the torque force of the driver is 1.5+/- 0.2kgf.cm 2.Take FFC from the M/B connector(pic2)...
  • Page 15 Standard Operation Procedure 8(1/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble TBT/B Operation Name : Ver. : Edit date For TBT SKU Step: 1. Take the screws*2(pic1)  the torque force of the driver is 1.5+/- 0.2kgf.cm 2.
  • Page 16 Standard Operation Procedure 8(2/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble Hood sensor Operation Name : Ver. : Edit date For Hood sensor SKU Step: 1. Take the housing from the middle body(pic1) 2. Take cable CNTR (pic2) 1、take housing left hook to the right to popup 2、pull out the right hook with the torque pic1...
  • Page 17 Standard Operation Procedure 9(1/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble HDD cable Operation Name : Ver. : Edit date For HDD SKU Step: 1. Take HDD cable connector.(pic1 ) pic1 Notice: Please inform production line leader or master if you found any abnormal.. Fixture list (Spec.) Symbol Half finger insert...
  • Page 18 Standard Operation Procedure 9(2/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Take DDR & shielding can Operation Name : Ver. : Edit date Step: 1. Take shielding can*1(pic1)  Take shielding can both side black mylar and then pull straight up at the same time. 2.
  • Page 19 Standard Operation Procedure 10(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble SSD Operation Name : Ver. : Edit date Step: 1. Take SSD screws and take the SSD(pic1) the torque force of the driver is 1.5+/- 0.2kgf.cm ...
  • Page 20 Standard Operation Procedure 11(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble CPU Operation Name : Ver. : Edit date Step: 1. Using a fixture to clamp the CPU to place the tray(pic1/pic2) 2. Bake to the connecting rod disassemble the CPU must use the fixture Fixture boss facing into the plate...
  • Page 21 Standard Operation Procedure 12(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble speaker Operation Name : Ver. : Edit date Step: 1. Take the speaker connector straight up(pic1) 2. Take the speaker housing right hook to the left and the take out speaker(pic2)...
  • Page 22 Standard Operation Procedure 12(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble LED and power set Operation Name : Ver. : Edit date Step: 1. Disassemble LED lens(pic1) 2. Remove the cable from LED end in turn(pic2) 3. Pull out the connector vertically and take out the power housing(pic3、pic4)...
  • Page 23 Standard Operation Procedure 13(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble DDR cover Operation Name : Ver. : Edit date Step: 1. push the hook according to the picture tdirection,(pic1) 2.Take the DDR cover;(pic2) Push the hook in this direction pic1 pic2 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 24 Standard Operation Procedure 14(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble DDR Operation Name : Ver. : Edit date Step: 1. Disassemble DDR(pic1) 2. Disassemble antenna cap(pic2) Open the DDR connector arm to 3. Disassemble antenna (pic3) both sides and pop out the DDR in the oblique direction When antenna is folded,lift...
  • Page 25 Standard Operation Procedure 15(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble WLAN card Operation Name : Ver. : Edit date For WLAN card SKU Step: 1. Disassemble screw*1、take WLAN card(pic1) the torque force of the driver is 1.5+/- 0.2kgf.cm pic1 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 26 Standard Operation Procedure 16(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble antenna Operation Name : Ver. : Edit date Step: 1. Take the antenna from the hole(pic1) 2. Take main antenna(pic2) 3. Take AUX antenna(pic3/pic4) pic1 Flip the fence upward and Flip the fence upward and take out the main antenna take out the AUX antenna...
  • Page 27 Standard Operation Procedure 17(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble M/B screw Operation Name : Ver. : Edit date Step: 1. Take M/B screws*5(pic1/pic2) the torque force of the driver is 3.0+/- 0.2kgf.cm  when taking the screw, align the driver head first and then turn the electric driver 图一...
  • Page 28 Standard Operation Procedure 18(1/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble M/B Operation Name : Ver. : Edit date Step: 1. Take M/B.(pic1) After M/B is picked up from the potion column, the boss village moves up and to the right with the metal in hand 定位柱...
  • Page 29 Standard Operation Procedure 18(2/2) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble M/B Operation Name : Ver. : Edit date Step: 1. Remove the M/B from the middle box in an oblique direction.(pic1) When taking out ,pay attention to the position in the picture pic1 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 30 Standard Operation Procedure 19(1/1) Document No. : Ludao disassembly SOP station 0.20 2020/7/1 Disassemble M/B battery Operation Name : Ver. : Edit date Step: 1. Remove the M/B battery from M/B (pic1) Remove the battery elastic arm to this direction and then take out the battery pic1 Notice: Please inform production line leader or master if you found any abnormal..

This manual is also suitable for:

Tpc-i046-dm-180Tpc-i046-dm-280