Q U I C K I N S T A L L G U I D E
Install the Enphase Enpower Smart Switch
To install the Enphase Enpower™ smart switch and the Enphase Enpower wall-mount bracket, read and follow all warnings and instructions in this guide and in
the Enphase Enpower Installation and Operation Manual at enphase.com/support. Safety warnings are listed on the back of this guide. These instructions are
not meant to be a complete explanation of how to design and install an energy storage system. All installations must comply with national and local electrical
codes and standards. Only qualified electricians shall install, troubleshoot, or replace the Enpower.
The Enphase Ensemble System includes the Enphase Enpower™ smart switch with Microgrid Interconnection Device (MID) capability, which
consolidates interconnection equipment into a single enclosure and streamlines grid-independent capabilities of PV and storage installations by
providing a consistent, pre-wired solution for residential applications. Along with MID functions, it includes PV, storage, and generator (reserved
for future use¹) input circuits.
Four unique installation
scenarios are shown:
Whole home backup with Enpower
as service entrance and PV combiner
connected to Enpower. This is the preferred
configuration for back up of the entire main
load panel. This configuration supports up
to an 80A breaker for the PV circuit and an
80A breaker for battery storage.
Whole home backup with Enpower
as service entrance and PV combiner
connected to main load panel. This is the
preferred configuration when you back up
the entire main load panel, and the size of
the PV combiner circuit is more than 80A. In
this configuration, the PV combiner circuit
connection space in Enpower is left vacant.
When existing PV combiner circuits are
connected to the main load panel, and you
want to add battery storage to the system,
you can keep the PV combiner connected
to the main load panel and connect only the
battery storage system to Enpower.
Partial home backup with main load panel
as service entrance and PV combiner
connected to Enpower. When PV circuits
breaker size is less than 80A, this is the
preferred configuration for partial home
backup with subpanel.
Model number: EP200G101-M240US00
© 2020 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enpower smart switch, Encharge storage system, IQ Envoy, IQ combiner, IQ microin-
verter, Installer Toolkit, Enlighten and other trademarks or service names are the trademarks of Enphase Energy, Inc. Data subject to change. 2020-09-29
Generator
(reserved for future use¹)
Generator
(reserved for future use¹)
Generator
(reserved for
future use¹)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Enpower EP200G101-M240US00 and is the answer not in the manual?

Questions and answers

Summary of Contents for enphase Enpower EP200G101-M240US00

  • Page 1 Install the Enphase Enpower Smart Switch To install the Enphase Enpower™ smart switch and the Enphase Enpower wall-mount bracket, read and follow all warnings and instructions in this guide and in the Enphase Enpower Installation and Operation Manual at enphase.com/support. Safety warnings are listed on the back of this guide. These instructions are not meant to be a complete explanation of how to design and install an energy storage system.
  • Page 2: Installation

    INSTALLATION A ) Inspect the packaging and the Enpower for damage. Do not install or Use the Enphase Installer Toolkit™ mobile app for iOS and Android devices. use the Enpower if it has been damaged in any way. It allows installers to configure the system while on site, eliminating the B ) Ensure that you have the following: need for a laptop and improving installation efficiency.
  • Page 3: Install The Wall-Mount Bracket

    Unbox and mount the Enpower on the wall Install the wall-mount bracket WARNING: Risk of injury. Take care when lifting. The Enpower is A ) Mark a plumb line over the wall stud as a guide. heavy 38.5 kg (85 lbs). WARNING! Multiple risks.
  • Page 4 You must follow all NEC and local electrical codes. WARNING: Risk of equipment damage. Do not remove the pre-in- Install breakers as needed for the AC grid, main load, Enphase IQ Com- stalled solar shield attached to the enclosure door.
  • Page 5 F ) Use the included stowed conductors, as labeled, to wire the circuit breaker(s) for the Encharge batteries, Enphase Combiner, and generator (reserved for future use¹), as needed. The stowed conductors are provided with crimped-on ferrules with end caps to prevent accidental contact.
  • Page 6: Operation

    CONFIGURE and ACTIVATE WARNING: Before energizing, make sure that ALL Enpower Use the Enphase Installer Toolkit to commission the Enpower. Once connections are properly installed and conductors terminated. connected to the Envoy, refer to the Installer Toolkit help topics for A ) Reconnect the deadfront ground cable to the grounding bar, torque more information.
  • Page 7: Safety Instructions

    IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS. This guide contains important instructions that you must follow during installation and maintenance of the Enphase Enpower. Failing to follow any of these instructions may void the warranty (enphase.com/warranty). In Case of Fire or Other Emergency...

Table of Contents