Sentry Sample II Low Pressure Installation, Operation & Maintenance Manual page 34

Sample conditioning automation
Table of Contents

Advertisement

8. Set the voltage source to read 0 V. Verify voltage source using a digital multimeter.
Input 0 V. Press the Enter key to begin calibrating.
9. The controller is done calibrating the 0 V when the Offset value stops adjusting
and the input value on the screen changes from 0 V to 2.5 V. Input 2.5 V for selected
channel. Press the Enter key.
10. The controller is done calibrating the 2.5 V when the Gain value stops adjusting.
Remove voltage from channel. Press the Enter screen to go to the channel selection
screen.
11. Repeat steps 8-11 for remaining channels requiring 0-2.5 V calibrations.
12. After calibration of all channels has been completed, use the ESC key to return to the
Operation Screen.
Flow Meter Calibration
Consult Factory for assistance.
34
Sentry Equipment Corp

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sample sentry ii high pressure

Table of Contents