Installation, Assembly, and Setup
Step 5
Control and Grounding Connections
For control and grounding connections:
(a) Install control and communication cabling using the
entry location in the cable termination area.
(b) Attach the ground bus of the PCS to the system
ground in accordance with the installation drawing.
(c) Seal the conduits with duct-sealing compound to
prevent water from entering the system through the
conduits.
Connection Checks
Check all field-installed cables and wiring to the power
conversion system by performing a "point-to-point" check
on all of the wiring to verify the system is wired, labeled,
and terminated per drawing PEA-1610-4-IN and any
project-specific drawings supplied with the PureWave
SMS-250. Note any problems found and corrective actions
applied.
Torques
Check all factory and field-bolted electrical connections
inside the PCS enclosure and verify they are torqued to
the proper tightness. See Table 1 for torque requirements.
Table 1. Torque requirements.
ASSEMBLY
PART
Panels
Dead-Front
Access
EMI
Panels
Fasteners
Bus
N/A
Connections
Tray
CT Terminal
Block
Islanding
Tray
Terminal
M4 Terminals
Blocks
Programmable
M3 Mounting
Logic Controller
Base Covers
Install the base covers (if not already installed) at the
front and back forklift entries of the enclosure. They are
typically stored on the inside of the enclosure door. See
Figure 9.
14
S&C Instruction Sheet 659-525
TORQUE
TORQUE
HARDWARE
TOOL
[N-M]
M8 Serrated
13mm
13 .6
Flange
Socket
M5x12
#2
3 .9
Screw
Phillips
M10 Flange
15mm
54 .2
Nut/Bolt
Socket
M8 Serrated
13mm
13 .6
Flange
Socket
#10-32
Slot
2
Terminals
Driver
Slot
1 .7
Driver
#1
1 .1
Phillips
[FT-LBS]
10
Base cover
2 .9
storage
location
40
10
1 .5
1 .25
0 .8
Figure 9. Location of base covers.