Operation - Pressure Tech Swiss PT-1000 Operation Manual

High pressure coolant pumps
Table of Contents

Advertisement

FILTER SYSTEM START-UP PROCEDURE
Prior to turning on the flow to the inlet service, please complete the following checks:
1. Check inside the filter unit to be sure the basket and filter bag (if applicable) are in the housing and do not
require cleaning or replacement. If necessary install a clean filter bag.
2. Check that the filter vessel cover is securely fastened to the housing. You are now ready to open the flow
to the inlet service line.
Once the desired service flow has been established, the filter will operate efficiently until dirty. However,
under no circumstances should more than 5 PSI differential pressure through the filter be obtained.
Operating the filter unit with a high differential may cause filter bags to rupture and/or cause damage to the
filter system and downstream equipment.
To prevent excessive drop through the filter unit, regular inspection of the filter media is required.
MAINTENANCE
When it becomes necessary to clean or replace the filter media, follow the procedure outlined below:
1. First close the flow from the inlet service line.
2. Close the flow to the outlet service line. (In some applications closing flow to outlet is not required.)
3. Relieve the pressure from the filter unit.
Operation Manual for PT-1000 & PT-2000

OPERATION

WARNING
CONTENTS UNDER PRESSURE
Relieve Pressure in accordance
with Manufacturer's instructions
before opening the Filter Vessel.
FAILURE TO DO SO MAY RESULT
IN SERIOUS BODILY INJURY.
Page 4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Swiss pt-2000

Table of Contents