AVIRE 4G DCP Installation Manual page 3

Digital communication platform
Table of Contents

Advertisement

Available languages

Available languages

+
LEDs on the front of the DCP unit will show the network signal level
+
+
+
+
+
+
+
Note: The signal scanner will
+
indicate the best location for the
device to receive signal, Network
+
coverage will vary based on local
conditions.
+
+
Once finished turn SW1 dipswitch 1 back to OFF.
You can check the status of the power supply, battery, connection, coverage or
Phone Line
(SLIC)
7.
With the power supply turned off, connect the positive and negative wires to the
removable plug on connector J6, and then insert the plug into the base of the
circuit.
IMPORTANT - The device must be connected to a circuit protected by a circuit
breaker so that both the positive and the neutral that supply the equipment can
be disconnected. To avoid accidents, the circuit breaker must be turned off before
handling the power cables.
at any time by referring to the LED Indicators (page 15).
J6
SW1
Voltage range is 100-240 V A.C. 50-60Hz
Neutral
Live
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents