AVIRE 4G DCP Installation Manual page 10

Digital communication platform
Table of Contents

Advertisement

Available languages

Available languages

On the other side of the page please enter the number of elevator group you have in
this installation and how many elevators you have in the group. As an example, if this
is a simplex installation the number of elevator groups will be "1" and the number of
elevators will also be "1". If it's a duplex installation it will be "1" and "2" respectively.
You can also edit the group names to easily identify installations. Once all information
is entered click "Next".
In the new page, you should be able to see Groups and Elevators. Click on "Add
Gateway" under "Gateway" tab and select "DCP 4G". A pop up window will appear
where you can enter the SIM information (Note: Avire SIMs are (+31), but this doesn't
affect costs). Enter all required information and then click "Apply".
Note: The Background Call Period is the frequency of test checks and 72hrs is the
maximum period as per guidance from standards.
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents