Step 2
Mount Holders and Console
1. Mount the Bottom Holders
Left, Middle and Right touching
each other.
(Distance to floor 20mm)
2. Mount Left Side and Right Side.
3. Verify Left and Right are fully
leveled and parallel.
4. Mount Top Left and Top Right.
5. Mount Console (next page).
Please always make sure all profiles are leveled in order to
make the top Frames touch each other with no gap.
Please select the suitable bolts, dowels and washers to attach the
frame to the wall according to wall properties (3-5 screws per part).
Need help?
Do you have a question about the MultiBall Pro and is the answer not in the manual?