CHAPTER
3
This section describes the procedures for installing the platform and cabling the server in a 1-meter
deep Honeywell cabinet.
Tasks for installing the server
l
Power and grounding requirements
l
Cabinet spacing requirements
l
Installing the server and connecting the cables
l
Starting the server
l
3.1
Tasks for installing the server
The following table lists the major platform installation tasks.
Checklist Tasks
Before you begin
l
3.1.1
Before you begin
Ensure that you perform the following tasks.
Ensure that the cabinet is properly grounded
l
Unpack the platform from the box and verify the parts
l
Place the server on a secure surface near the cabinet to mount
l
Ensure that you have the necessary cables ready
l
3.2
Power and grounding requirements
The ground connection is made through the third wire in the AC power cord.
3.2.1
Grounding consoles and cabinets
The TPN System Installation Manual, SW20-600 , provides information on grounding furniture,
including the following:
I
NSTALLATION
Understanding the Power and grounding requirements. Also refer to, TPN
System Installation Guide (SW20-600) .
Starting the server
- 26 -