Start Up &
Shut Down
Before starting unit make sure the flow control valve located behind the
access door on the front of the unit is closed to prevent excessive start-
up pressures. The valve handle should be in the upright position. After
the unit has started, open the valve until the desired flow and pressure
is observed on the front panel displays.
Ensure cooling water is always available to the unit.
NOTE:
NOTE:
To avoid premature depletion of DI cartridge resins, always run the unit
with the tank filler cap on and the bleed valve shut.