1
3
4
3 Remove 2 screws (class 15~42) or 3 screws (class 50~71) from
the front grille.
4 Push down the 3 upper hooks marked with a symbol with 3
circles.
a
b
a
Upper hook
b
Symbol with 3 circles
5 We recommend opening the flap before removing the front
grille.
6 Place both hands under the centre of the front grille, push it up
and then toward you.
A
e
53
CTXM15+FTXM20~42+ATXM20~35R2/5V1B +
FTXM50~71R2V1B + ATXM50R2V1B
Daikin room air conditioner
3P482320-11R – 2020.06
2
3×
a
a
b
c
120
169
d
a
h
a
160
50
293.5
5.3
Mounting the indoor unit
5.3.1
To install the mounting plate
1 Install the mounting plate temporarily.
2 Level the mounting plate.
3 Mark the centres of the drilling points on the wall using a tape
measure. Position the end of tape measure at symbol " ".
4 Finish the installation by securing the mounting plate on the wall
using M4×25L screws (field supply).
Class 15~42
INFORMATION
The removed pipe port cover can be kept in the mounting
plate pocket.
a
c
a
279
f
A
A
g
a
a
170
377.5
778
5 Unit installation
Class 50~71
120
d
e
53
(mm)
Installation manual
5
Need help?
Do you have a question about the Perfera CTXM15R2V1B and is the answer not in the manual?
Questions and answers