SkyLink ATOMS ATR Series Instruction Manual page 8

Dc motor belt drive
Table of Contents

Advertisement

INSTALL THE HEADER BRACKET
3. Attach a 2x4 (if necessary)
If the calculated header bracket is above the door header, attach a 2x4 between two studs to install
the header bracket.
Door header
4. Attach the Header Bracket
Place the bottom edge of the bracket on the line marked above t he highest point of travel.
1 1/4" (3 cm) Above
Sectional Door or
7" (18 cm) Above
Mark the 2 holes
One-piece Jamb Door
with a pencil.
Highest Point of Travel
Note the orientation of the header bracket. Do not mount it upside down.
5" (12.7 cm)
Use lag screws (not included) to attach the 2x4.
Drill two 3/16" (5 mm)
Attach the header bracket with
pilot holes.
2 lag screws provided.
Ceiling Installation
The header bracket may be mounted to the ceiling if
there is minimal clearance above the door. If so, extend
the centreline to the ceiling. The back edge of the
bracket must not be further than 5" (12.7 cm) from the
header wall.
INSTALL THE HEADER BRACKET
5. Position The Opener
6. Connect the Rail to the Header Bracket
D3 (x2)
15
15
Position the pulley bracket against the header bracket.
Position the opener on the floor with packaging
material as protective base.
Align the bracket holes and join with a clevis pin
and hitch pin as shown.
D2 (X1)
D1 (X1)
16
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atoms anr seriesAtoms+ atr series

Table of Contents