Aerus Air Scrubber Owner's Manual
Hide thumbs Also See for Air Scrubber:
Table of Contents

Advertisement

Available languages

Available languages

Electronic Air Purification System
CAUTION: READ MANUAL CAREFULLY FOR PROPER PROCEDURES AND OPERATION
65-00717_VA-01247

Advertisement

Table of Contents
loading

Summary of Contents for Aerus Air Scrubber

  • Page 1 Electronic Air Purification System CAUTION: READ MANUAL CAREFULLY FOR PROPER PROCEDURES AND OPERATION 65-00717_VA-01247...
  • Page 2: Table Of Contents

    Specifications ......2 on your purchase of an Air Scrubber by Aerus® About Air Scrubber by Aerus....2 air purification enhancement system. This unit Product Contents.
  • Page 3: Product Contents

    PRODUCT CONTENTS Mounting Power Plate Cord Replaceable ActivePure® Cell (includes UV Lamp) UV bulb indicator Safety Switch INSTALLATION HARDWARE (SUPPLIED) (4) #6 - 32 (8) #8 - .75 (4) #6 - 32 X 2 inch Toggle bolt wall anchors 1/4” Self-tapping screws Threaded bolts Item # US70682 Item # US70679...
  • Page 4: Installation Requirements

    3. When installing near a furnace or heating coils, run the heating system through five (5) full heating cycles to ensure the temperature of the Air Scrubber by Aerus unit does not exceed 200˚F. 4. An approximate 3.5” (8.89 cm) opening will need to be cut into the existing ductwork to install the unit properly.
  • Page 5: Metal Ductwork Installation

    ALTERNATIVE CUTTING METHOD b. Drill 4 holes where marked. a. Using template, mark 4 Cutting Method holes on duct. c. Cut between holes using tin snips. METAL DUCTWORK INSTALLATION (CONTINUED) 5. Remove backing from 6. Center openings and press mounting plate onto duct. mounting plate adhesive gasket.
  • Page 6: Fiberglass Ductwork Installation

    FIBERGLASS DUCTWORK INSTALLATION 1. Locate suitable area 2. Mark location for 3.5” opening using either the of duct for installation. mounting plate or included template. Also mark the locations of 4 screw holes in corners (see template). 3. Cut hole in duct using 3.5” hole saw. 4.
  • Page 8 MARK MARK IF USING MARK C MARK IF USING MARK...
  • Page 9 FOR DUCT INSTALLATION G ALTERNATIVE CUTTING METHOD CENTER FOR 3.5” HOLE SAW G ALTERNATIVE CUTTING METHOD K FOR DUCT INSTALLATION...
  • Page 11 FIBERGLASS DUCTWORK INSTALLATION (CONTINUED) Stud 5. Remove backing from mounting plate 6. Insert (4) 2” Threaded bolts into screw holes at adhesive gasket. corners of mounting plate. Attach (4) toggle bolt anchors to ends of threaded bolts. 7. Insert (4) toggle bolts into 3/8” holes in duct. Be 8.
  • Page 12: Maintenance/Uv Lamp Indicator

    MAINTENANCE/UV LAMP INDICATOR Your Air Scrubber by Aerus unit requires no periodic maintenance beyond normal replacement of the UV Lamp Operation Indicator ActivePure® Cell every 2 years. UV bulb has an effective life of 18,000 continuous hours. The UV lamp operation indicator on the face of the unit will glow when the UV lamp is in use.
  • Page 13: Changing The Activepure® Cell

    CHANGING THE ACTIVEPURE® CELL CAUTION: Disconnect power at the breaker or fuse panel before servicing unit. Always follow OSHA lockout procedures to prevent accidental expo- sure to electrical energy. WARNING: UV Light in operation. Disconnect unit from power cord before servicing. Failure to follow warnings may result in severe eye damage.
  • Page 14: Changing The Ballast

    R E P L AC I N G T H E B A L L A S T CAUTION: Disconnect power at the breaker or fuse panel before servicing unit. Always follow OSHA lockout procedures to prevent accidental exposure to electrical energy. WARNING: UV Light in operation.
  • Page 15 R E P L AC I N G T H E B A L L A S T (co n t i n u e d ) 6. To reconnect wiring, insert wire into wire pocket in ballast until bottomed. Gently pull wire to ensure it is properly locked into place.
  • Page 16 Name: DBG Group Investments, LLC comply with the limits for Industrial, Scientific, and Medical Equipment (ISM), pursuant to Part Model: Air Scrubber by Aerus 18 of the FCC Rules. These limits are designed to Manufacturer: provide reasonable protection against harmful DBG Group Investments, LLC interference in a residential installation.
  • Page 17 Système électronique de purification de l’air ATTENTION: VEUILLEZ LIRE ATTENTIVEMENT LE PRESENT MANUEL POUR OBTENIR LES INDICATIONS D’ULTILISATION ET DE FONCTIONNEMENT CORRECTES. 65-00717_VA-01247...
  • Page 18: Caractéristiques

    Caractéristiques ......18 pour l'achat de votre système d'amélioration de la À propos de l’Air Scrubber by Aerus ..18 purification d’air Air Scrubber by Aerus. Cette unité...
  • Page 19: Contenu Du Produit

    CONTENU DU PRODUIT Plaque de Cordon montage d'alimentation Cellule remplaçable ActivePure® (comprend un témoin UV) Témoin lumineux UV Commutateur de sécurité MATÉRIEL D'INSTALLATION (FOURNI) (4) #6 - 32 (8) #8 - .75 (4) #6 - 32 X 2 Boulons d’ancrage mural à ailettes Vis auto-taraudeuses 1/4»...
  • Page 20: Conditions D'installation

    (5) cycles de chauffage complets pour vérifier que la température de l'unité Air Scrubber by Aerus ne dépasse pas 200˚F (93°C). 4. Une ouverture d'environ 3,5" (8,89 cm) doit être pratiquée dans le conduit existant pour installer l'unité...
  • Page 21 MÉTHODE DE DÉCOUPE ALTERNATIVE b. Percez 4 orifices aux endroits marqués. a. Marquez 4 orifices de découpe sur le conduit en suivant le modèle. c. Coupez entre les orifices à l'aide des cisailles à tôle. INSTALLATION DES CONDUITS MÉTALLIQUES (SUITE) 5.
  • Page 22: Installation Des Conduits En Fibre De Verre

    INSTALLATION DES CONDUITS EN FIBRE DE VERRE 2. Marquez l'emplacement d'une ouverture de 3,5" 1. Repérez une zone qui convienne à à l'aide de la plaque de montage ou du modèle l'installation d'un conduit. inclus. Marquez également les emplacements des 4 trous de vis dans les coins (voir modèle). 3.
  • Page 24 MARQUE POUR L’INSTALLA MARQUE POUR L MARQUE MARQUE POUR L MARQUE POUR L’INSTALLA...
  • Page 25 ATION SUR UN CONDUIT EN FIBRE DE VERRE LA MÉTHODE DE COUPE ALTERNATIVE DU CENTRE POUR LA SCIE CLOCHE DE 3,5 PO LA MÉTHODE DE COUPE ALTERNATIVE ATION SUR UN CONDUIT EN FIBRE DE VERRE...
  • Page 27 INSTALLATION DES CONDUITS EN FIBRE DE VERRE (SUITE) Clou 5. Retirez le support du joint adhésif de la plaque 6. Insérez (4) boulons filetés de 2" dans les trous de vis de montage. aux coins de la plaque de montage. Fixez (4) boulons d'ancrage à...
  • Page 28: Témoin Lumineux Uv/Témoin Lumineux

    TÉMOIN LUMINEUX UV/TÉMOIN LUMINEUX D'ENTRETIEN Votre unité Air Scrubber by Aerus ne nécessite aucun entretien régulier en dehors du remplacement 2 ans normal de la Cellule ActivePure®. L'ampoule Témoin Lumineux UV UV possède une durée de vie de 18 000 heures en continu.
  • Page 29: Changer La Cellule Activepure

    CHANGER LA CELLULE ACTIVEPURE® ATTENTION : Mettez le disjoncteur ou le panneau de fusibles hors tension avant de procéder à la révision de l'unité. Respectez toujours les procédures de verrouillage OSHA afin de prévenir toute exposition accidentelle à l'énergie électrique. AVERTISSEMENT : Témoin UV actif.
  • Page 30: Changer Le Ballast

    REMPLACEMENT DU BALLAST ATTENTION : Mettez le disjoncteur ou le panneau de fusibles hors tension avant de procéder à la révision de l'unité. Respectez toujours les procédures de verrouillage OSHA afin de prévenir toute exposition accidentelle à l'énergie électrique. AVERTISSEMENT : Témoin UV actif. Débranchez le cordon d'alimentation de l'appareil avant tout entretien.
  • Page 31 REMPLACEMENT DU BALLAST (suite) 6. Pour reconnecter le câblage, insérez le câble dans l'encoche située sur le ballast jusqu'à en atteindre le fond. Tirez doucement sur le câble afin de vous assurer qu'il y soit correctement verrouillé. 7. Replacez le couvercle et fixez-le à l'aide des quatre (4) vis originales.
  • Page 32 Nom : DBG Group Investments, LLC aux normes concernant les équipements industriels, scientifiques, et médicaux (ISM), Modèle : Air Scrubber by Aerus conformément à la section 18 du règlement de la Fabricant : DBG Group Investments, LLC FCC. Ces normes sont conçues pour assurer une protection raisonnable contre les interférences...

Table of Contents