Aerus Air Scrubber Owner's Manual page 11

Hide thumbs Also See for Air Scrubber:
Table of Contents

Advertisement

Available languages

Available languages

FIBERGLASS DUCTWORK INSTALLATION
5. Remove backing from mounting plate
adhesive gasket.
7. Insert (4) toggle bolts into 3/8" holes in duct. Be
sure toggle anchors open after inserting.
9. Insert unit into opening. Be sure the air will pass
through the ActivePure® Cell honeycomb matrix.
11. Power Connection Requirements: This device is designed for operation from a 24 VAC transformer
typically supplied with straight cool or HVAC systems and can accept a voltage input range of 22V-32VAC.
As these transformers also power other circuits, the load capacity of the transformer must be verified
prior to installation to accommodate the maximum combined load requirements of both the device
(18 VA) and all other circuits powered from the transformer. The minimum voltage output from the
transformer under maximum load from all circuits including the device should also meet the minimum
voltage input requirements of each circuit's operational specification including the device. If these
conditions cannot be met, installation of a separate 24 VAC transformer is recommended. Do not connect
this unit to any voltage source above 32 volts. Doing so will cause damage to the unit.
NOTE: Unit requires continuous power. Do not install where power to the unit will be cycled on and off.
(CONTINUED)
6. Insert (4) 2" Threaded bolts into screw holes at
corners of mounting plate. Attach (4) toggle bolt
anchors to ends of threaded bolts.
8. Center large opening in mounting plate over
3.5" opening in duct and press plate to duct.
The adhesive gasket will hold the mounting
plate into place.
Tighten toggle bolts - DO NOT OVERTIGHTEN.
10. Secure the unit to the mounting plate with
(4) thumb nuts.
Stud
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents