AGT PSG MAK10 Installation Manual, Operating Manual, Maintenance Manual, Spare Part List page 8

Sample gas conditioner
Table of Contents

Advertisement

Installation-, Operating-, Maintenance-Manual, Spare part List
Assembly and Installation
Feed Lines
All operations mentioned below to be performed by qualified personnel only.
As a standard, medium connections of the sample gas cooler have been designed for a 6/4mm hose. The
sample gas cooler is equipped with 1-4 heat-exchangers (PTFE/PVDF) and provides 1-4 gaspaths. The
following feed lines must be connected:
Sample gas pipelines to the gas inlet connections
Analyzers to the gas outlet connections
Condensate pumps/tanks to the condensate outlet connections
Marking
Gas inlet
Gas inlet (left)
Depending on model type, your sample gas cooler can be equipped with/without condensate
pumps. Some model types can be equipped with special heat exchangers with condensate
outlet at the bottom (pipe, 12mm outer diameter, without thread). In this case, always put the
housing on ca. 5cm high rails when mounting or moving the cooler. Otherwise protruding
condensate connectors at the bottom of the housing can be damaged.
AGT-PSG GmbH & Co.KG
Errors and printing mistakes excepted
Marking
Gas outlet
Gas outlet (right)
Condensate outlet
Translation - Manual MAK10 Rev. 11/2017
MAK10
Page 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Psg mak10 peltier

Table of Contents