Download Print this page

Garden Games Playhouses Whacky & Crooked Tower Instructions Manual page 5

Advertisement

3
You will need:
Assembled chimney from step 2 (parts 8 -12)
Large Roof Panel (part 6)
4 x Screws B (4 x 30mm)
Screw the chimney to the roof panel by using four screws 'B' . The screws should go through the pre-drilled holes
on the underside of the roof panel and into four corners on the underside of the chimney.
4
You will need:
Main house frame as assembled in Step 1 (parts 1 - 4)
Roof Panels - parts 5 & 6
10 x Screws A (4 x 50mm)
Lay the roof panels (parts 5 & 6) onto the assembled frame from Step 1. Attach the front and back panels of the
house to the wooden batons on the underside of the roof panels using ten Screws 'A' .
You will need two for the shorter roof panels (front and back, so four in total) and three for each side of the longer
roof panels (six in total). The screws go into the front or back panel first, then into the batons on the underside of
the roof panel.
Building the Main House: Attach the Chimney to the Roof
diagram 3
Building the Main House: Attach the Playhouse Roof
x5
Screw
A
Screw
B
x4
x5
Screw
A
diagram 4
4

Advertisement

loading