System Data ......................29 System and Maintenance Information ..............29 Enabling Automatic Heating ................30 Service and Repair ....................30 Service and Repair Contact ................31 Manufacturer Warranty ..................31 Technical Documentation ..................31 Risk Assessment ....................31 Asahi/America Contacts..................32 agru SP 110-S Version September 2017 User’s Manual...
Page 4
Caution damage. If the machine is operated through a power supply without a grounding conductor, this will void any and all warranty under which the product may be. agru SP 110-S V3 User’s Manual Version September 2017...
Non-compliance may cause problems of operation and damage to the machine. Important This icon indicates tips and useful information for using the machine more efficiently and more economically. Info agru SP 110-S V3 User’s Manual Version September 2017...
User’s Manual The User’s Manual has to be available at any time on the site Info where the machine is used. If the User’s Manual should come agru SP 110-S V3 User’s Manual Version September 2017...
Using the machine, as far as possible, only standing on its stand which doubles as a Caution storage box is highly recommended. agru SP 110-S V3 User’s Manual Version September 2017...
Exklusives Produkt der Fa. agru Kunststofftechnik GmbH Intended Use Ing.-Pesendorfer-Str. 31 The agru SP 110-S V3 Welding Machine is designed exclusively for A - 4540 Bad Hall Tel. +43 7258 790 3503 welding plastic pipes and fittings using the infrared welding technique Fax +43 7528 790 3852 (butt welding without contact).
- Display of/data on welding progress - Parameter menus to configure operation settings - Input keyboards - Error messages/Notes Navigation Bar with User Interface Buttons (changes depending on context of display) agru SP 110-S V3 User’s Manual Version September 2017...
Pipe ends are worked using the facing tool until the machine indicates facing completed, to be confirmed on the touchscreen; then removal of chips and shavings (vacuum cleaner recommended). • Pipe alignment is checked and confirmed on the touchscreen. Version September 2017 agru SP 110-S V3 User’s Manual...
Handle for Carrying Box Machine with Engaged Transport Locks in Upper Part Latch for Securing Upper to Lower Part of Box Drawer for Accessories Drawer for Label Tag Printer Drawer for Reducer Inserts agru SP 110-S V3 User’s Manual Version September 2017...
• Install the upper part of the transport box and close the box by installing its front, securing everything by engaging the various latches between the parts of the box. agru SP 110-S V3 User’s Manual Version September 2017...
The next automatic step at power-up, after welder code input, is the zeroing of the movements. Without successful zero point of reference calibration, the heating element will not heat up for welding. agru SP 110-S V3 User’s Manual Version September 2017...
• manipulation by holding down both Display 4 pushbuttons starting machine movements until the welder code input screen ap-pears and a valid welder code is required to unlock the machine agru SP 110-S V3 User’s Manual Version September 2017...
Page 15
OFF: The force depicted by the diagram in the course of the welding process is the value exercised on the force transducer. agru SP 110-S V3 User’s Manual Version September 2017...
So far, the system is in semi-automatic mode. For it suspends the ongoing action as soon as the user releases one or both pushbuttons. agru SP 110-S V3 User’s Manual Version September 2017...
(standard or additional) parameter sets. The manufacturer is in no event liable for damage or consequential damage that occurs as a Important agru SP 110-S V3 User’s Manual Version September 2017...
It offers Display 8 re-entering the parameter set just selected from the start, editing its pa- agru SP 110-S V3 User’s Manual Version September 2017...
Make sure that all parts to be jointed are dual-clamped and/or appropriately supported. Important agru SP 110-S V3 User’s Manual Version September 2017...
Page 20
Important together without facing and without previous loading and align- ing. Still, even when a parameter set without facing process is applicable, the movements of the facing tool have to be agru SP 110-S V3 User’s Manual Version September 2017...
Display 13 pre-heating (see Display 13): red color indicates the component that will be pre-heated. To start a welding process without pre-heating, simply agru SP 110-S V3 User’s Manual Version September 2017...
4.7.7 Cooling Phase Display 15 When the full joining force is reached, the machine moves on automatically to the cooling phase (see Display 16). During cooling, the applied joining force is constantly monitored. agru SP 110-S V3 User’s Manual Version September 2017...
When the value is displayed in the input screen press . The input screen closes and the value appears in the previously touched field of the visual check management screen. agru SP 110-S V3 User’s Manual Version September 2017...
The internal real-time clock of the machine is defective; re-set the clock in the configuration menu. When the machine is switched on with defective clock, the set-clock screen pops up automatically. agru SP 110-S V3 User’s Manual Version September 2017...
Page 25
The temperature is out of tolerance and cannot be ture Too High || Too Low adjusted; as long as this error is not cleared, welding or repeating a welding operation is not possible. agru SP 110-S V3 User’s Manual Version September 2017...
Printing Pipe Labels and Downloading Welding Reports The machine is equipped with USB A interface that gives you the oppor- tunity to connect the tag printer or, if permitted, a USB stick. agru SP 110-S V3 User’s Manual Version September 2017...
(before the slash), along with the total number of Display 21 reports in memory (after the slash). To move the selection bar through the list, touch the scrollbar arrows to the right of the list. The longer you agru SP 110-S V3 User’s Manual Version September 2017...
If the respective filter is not enabled in the upper part of the screen the cursor keys at the criterion in the lower part will not allow “filtered” browsing through the reports. agru SP 110-S V3 User’s Manual Version September 2017...
The standard screen (Display 3) allows access to system data (control software version, service and maintenance contact, etc.), which may be requested by the manufacturer or seller in case of malfunctions, as well agru SP 110-S V3 User’s Manual Version September 2017...
Service and Repair As the machine is used in applications that are sensitive to safety con- siderations, it may be serviced and repaired only on our premises or by agru SP 110-S V3 User’s Manual Version September 2017...
Risk Assessment A risk assessment under the provisions of the so-called machinery direc- tive 2006/42/EC was conducted for the machine by a qualified person entitled to the performance of such an assessment. agru SP 110-S V3 User’s Manual Version September 2017...
Field Technician/Onsite Training Field Training 617-480-7071 info@asahi-america.com Technical Service High Purity, Double Wall or Industrial Piping 781-321-5409 pipe@asahi-america.com Asahi/America Corporate Headquarters Asahi/America, Inc. 655 Andover St. Lawrence, MA 01843 800-343-3618 asahi@asahi-america.com agru SP 110-S V3 User’s Manual Version September 2017...
Page 33
Tel: 781-321-5409 ● Fax: 800-787-6861 ● Toll Free: 800-343-3618 www.asahi-america.com ● asahi@asahi-america.com Direct Sales: East 800-232-7244 / Central 800-442-7244 / West: 800-282-7244...
Need help?
Do you have a question about the agru SP 110-S V3 and is the answer not in the manual?
Questions and answers