Heat Exchanger (Pressure Sensor And Fcv) - Mitsubishi Electric CITY MULTI PFFY-W20VCM-A Technical & Service Manual

Table of Contents

Advertisement

[ VIII Disassembly Procedure ]

7. Heat exchanger (Pressure sensor and FCV)

Be careful removing heavy parts.
1. Removing the control box cover, front plate, control box
and drain pan
(1) Remove the control box cover (A) with procedure [1]-1.
(2) Remove the front plate (D), (E) with procedure [1]-3.
(3) Remove the control box (F) with procedure [1]-3.
(4) Pull out the drain pan with procedure [1]-3.
2. Remove the heat exchanger cover
(1) Remove the heat exchanger cover (G) with procedure
[1]-4.
3. Removing the cover
(1) Remove the three fixing screws on the cover (N) to re-
move it. (Fig.16)
4. Removing the Heat exchanger
(1) Remove the fixing screws on the heat exchanger (P) to
remove it (Fig.17, 18).
Removed heat exchanger is as shown Fig. 19
HWE18170
Fig.16
Fig.17
Fig.18
Fig.19
- 28 -
(N)
(P)
GB

Advertisement

Table of Contents
loading

Table of Contents