KWIK GOAL 2B2 Assembly Instructions

KWIK GOAL 2B2 Assembly Instructions

Portable futsal soccer goal

Advertisement

ASSEMBLY INSTRUCTIONS FOR 2B2 PORTABLE FUTSAL SOCCER GOAL

1. Unpack all parts and check for damage that may have occurred during shipping. If damage has occurred,
notify trucking company immediately. Lay out all parts. Remove all cardboard and packaging immediately.
Wet or damp packaging may damage contents.
2. Read through entire instruction before beginning assembly and installation.
3.
If goal is to be used in a portable application continue to step 4. If goal is to be used in a more permanent
application skip steps 4 through 6 and begin assembly with step 7.
Net Fastener (1)
(Part# VZ229)
All Kwik Goal products carry a Lifetime Guarantee. For help with
guarantee issues, visit kwikgoal.com and click on the Lifetime
Guarantee logo or contact customer service at
Post (2)
(Part# UZ510)
Base (2)
(Part# UZ527)
Net (1)
(Part# 3B1)
140 Pacific Drive Quakertown, PA 18951
(P) 215-536-2200 / (P) 800-531-4252 / (F) 215-536-4309 / (F) 800-778-8869
Visit our website @ kwikgoal.com
Ground Anchor (4)
(Part# TZ150)
2007, Rev. 2011 Kwik Goal Ltd.
.
1-800-531-4252
Rail w/ swage (2)
(Part# UZ509)
Rail w/o swage (2)
(Part# UZ493)
Rubber Pad (5)
(Part# VZ188)
NZ73 Rev. 01/13/11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2B2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for KWIK GOAL 2B2

  • Page 1 All Kwik Goal products carry a Lifetime Guarantee. For help with guarantee issues, visit kwikgoal.com and click on the Lifetime Guarantee logo or contact customer service at 1-800-531-4252 ASSEMBLY INSTRUCTIONS FOR 2B2 PORTABLE FUTSAL SOCCER GOAL 1. Unpack all parts and check for damage that may have occurred during shipping. If damage has occurred, notify trucking company immediately.
  • Page 2 Rail 4. Assemble rails, bases and posts as shown. w/ swage Post Rail w/o swage Base PUSH Post Rail w/o swage Rail w/ swage Base 5. Attach net to goal using net fastener, provided. Be sure to cut net fastener into 9”-10” pieces to ensure 2” overlap. Top Corner 6.
  • Page 3 Rail 7. Assemble rails, base and post as shown. w/ swage Post PUSH Base Rail w/o swage 8. Weave assembled parts onto net as shown. Be sure to note the location of the top corner net tag. Rail w/ swage Post Top Corner Net Tag...
  • Page 4 10. Weave base through net and attach to rail as shown. Post Base Rail Base w/o swage Rail w/ swage 11. Disconnect post from goal and weave through net as shown. Reconnect post to base and rails as shown. Post Rail Post w/ swage...

Table of Contents