Download Print this page

Ryobi RY42102 Operator's Manual page 60

Electric blower
Hide thumbs Also See for RY42102:

Advertisement

Available languages

Available languages

NOTE: When replacing the guide bar and chain,
always use the specified bar and chain listed in
the Bar and Chain Combinations section later
in this manual.
 Disconnect chain saw from power supply.
 Rotate the chain cover lock knob counterclockwise
until chain cover can be removed.
 Remove the chain cover.
 Rotate the chain tension assembly completely
counterclockwise.
 Remove the bar and chain from mounting surface.
 Remove the old chain from the bar.
 Remove the screw and chain tension assembly
from the old bar.
CHAIN TENSION
ADJUSTMENT RING
CHAIN TENSION
ASSEMBLY
BAR
MOUNT
CHAIN
COVER
CHAIN TENSION
ADJUSTMENT
RING
MAINTENANCE
CHAIN COVER
LOCK KNOB
Fig. 24
CHAIN
CHAIN COVER
LOCK KNOB
Fig. 25
Page 26 — English
 Install the chain tension assembly on the new
bar by inserting the tab into one bar hole and
installing the screw through the other. Tighten
securely.
 Lay out the new saw chain in a loop and
straighten any kinks. The cutters should face in
the direction of chain rotation. If they face the
opposite direction, turn the loop over.
 Place the chain drive links into the bar groove
as shown.
NOTE: Make certain of direction of chain.
 Position the chain so there is a loop at the back
of the bar.
SCREW
CUTTERS CHAIN ROTATION
CHAIN DRIVE LINKS
TAB
CHAIN
TENSION
ASSEMBLY
Fig. 26
Fig. 27

Hide quick links:

Advertisement

loading