INSTALLATION
UNPACKING
Retain all packing material in case
you need to return the instrument
NOTE
to the manufacturer for service.
1. Verify that all components listed have been
included:
•
DigiPREP block
•
Operation manual
•
DigiPROBE dongle
•
DigiTUBE rack
•Jr: 1 rack
•MS: 2 racks
•LS: 3 racks
•HP: 0 racks
Optional items, such as glass, quartz,
calibrated or non-calibrated digestion
tubes may have been included in the
shipment. Carefully check the packing
list(s) and the contents of shipping
NOTE
cartons
listed are included. Please notify SCP
SCIENCE or your local distributor of
any discrepancies.
Inspect the products for any shipping damage.
If the instrument has been damaged in shipping,
contact the freight carrier to report damage and
to fi le a damage report. Also contact the SCP
SCIENCE service department to report damage
and to request service information (see page 88
for contact information).
If you fi nd evidence of damage, do
WARNING
not attempt to operate the instrument.
KeyPad
38
Version 1.0
to
verify
that
all
SCP SCIENCE
SETTING UP
Place the DigiPREP block in a fume hood. The
controller must not be placed in the fume hood.
With the controller's power switch in the "off"
position, do the following:
• Verify that the voltage selector at the back of the
DigiPREP block is properly set.(Typically 115 for
North
America,
• Connect the block's umbilical cable to the
controller.
Disconnecting or reconnecting the
umbilical cable while the controller is
WARNING
turned on, especially while it is on the
RUN
permanent damage to the instrument.
• Connect the power cord to the back of the
controller .
• Connect the DigiSET (or DigiSET dongle)
to the back of the controller.
• Connect DigiPROBE (or DigiPROBE dongle)
to the back of the block.
items
If you are not using the DigiPROBEor
DigiSET,
NOTE
connected; otherwise, an error message
may be displayed.
• Insert the glass well liner into the DigiPROBE well.
(Small hole near right of block)
• If you are using DigiPROBE, insert the PROBE
into the well liner.
The system is now ready to be plugged in
and turned on. Please see your controller
manual for operation instructions.
and
230
for
screen,
will
likely
result
the
dongles
must
Europe.)
in
be
Need help?
Do you have a question about the DigiPREP and is the answer not in the manual?
Questions and answers