National Instruments Compact FieldPoint cFP-20 Series User Manual page 12

Hide thumbs Also See for Compact FieldPoint cFP-20 Series:
Table of Contents

Advertisement

Chapter 1
Overview of Compact FieldPoint
cFP-20xx and cFP-BP-x User Manual
2.
Install software as described in Chapter 2,
FieldPoint Hardware and
a.
Install programming software (LabVIEW RT).
b.
Install FieldPoint software.
3.
Configure Compact FieldPoint system and verify configuration as
described in the Measurement & Automation Explorer Help for
FieldPoint.
a.
Configure cFP-20xx network settings.
b.
Configure I/O module ranges and settings.
c.
Configure security.
d.
Connect input signals and loads to I/O modules.
e.
Test channels.
f.
Save settings.
4.
Configure optional settings as described in Chapter 3,
Descriptions.
5.
Develop application as described in Chapter 4,
Programming.
a.
Launch LabVIEW RT.
b.
Build basic application.
c.
Switch execution target to test application on cFP-20xx.
d.
Embed application by building
to cFP-20xx.
e.
Test embedded application.
6.
Deploy system.
Software.
.exe
1-4
Installing Compact
Feature
LabVIEW RT
with LabVIEW RT targeted
ni.com

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compact FieldPoint cFP-20 Series and is the answer not in the manual?

Table of Contents