Installation Steps - Welltime Summer NDB2142 Installation Instructions Manual

Full shower
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 14

Installation steps

Step 1
- Alignment of height-adjustable feet with spirit level.
- In the siphon area concrete is to be chipped off if necessary.
Step 2
- Press the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the waste water hose to the siphon body [7] and hook it up with the in-house water
disposal.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. The silicone is to be chosen respectively to the construction
materials used - please respect cure times.
- 20 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

698607

Table of Contents