Checking After Installation - Huawei SUN2000-45KTL-US-HV-D0 Quick Manual

Hide thumbs Also See for SUN2000-45KTL-US-HV-D0:
Table of Contents

Advertisement

2. Route the cable through the waterproof connector.
3. Insert the RJ45 connector into the RJ45 network
port in the SUN2000 maintenance compartment.
5. Tighten the thread-lock sealing nut and seal the waterproof connector.
6

Checking After Installation

1. The SUN2000 is installed correctly and securely.
2. The DC switches and downstream AC switch are OFF.
3. All ground cables are connected securely.
4. AC output power cables are connected correctly and securely,
without open circuits or short circuits.
5. DC input power cables are connected correctly and securely,
without open circuits or short circuits.
6. The RS485 communications cable is connected correctly and
securely.
7. All tube openings and/or used waterproof connectors at the
chassis bottom are sealed.
8. The AC terminal cover is reinstalled.
9. Check that the maintenance compartment is clean and tidy,
without foreign matter.
10. The maintenance compartment door is closed and secured with
screws.
11.Unused DC input terminals are sealed.
12.Unused USB ports are plugged with waterproof caps.
13.Unused waterproof connectors are covered and the cable
glands are tightened.
4. Bundle communications cables after
connecting them.
19
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □

Advertisement

Table of Contents
loading

Table of Contents