Download Print this page

Sareer Selina Manual

Side 5' bed
Hide thumbs Also See for Selina:

Advertisement

Quick Links

20
mins
Approximate
Assembly Time
Two persons are
recommended to
assemble this product
2360mm
Selina Side 5' Bed
BEFORE STARTING...
Read the assembly instructions carefully before
beginning assembly.
Check and ensure that you have all parts and fittings
for complete assembly.
Choose a clean, level, spacious assembly area.
Hard surfaces may damage the product.
The packaging and contents can be a choking
hazard, therefore keep out of reach of small children
at all times.
Do not over tighten the bolts as this may damage
the thread.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Selina and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sareer Selina

  • Page 1 Approximate Assembly Time Two persons are recommended to assemble this product 2360mm Selina Side 5' Bed BEFORE STARTING... ■ Read the assembly instructions carefully before beginning assembly. ■ Check and ensure that you have all parts and fittings for complete assembly.
  • Page 2 PART ② ② ③ ① ⑦ ④ ⑥ ⑤ ⑪ ⑩ ⑨ ⑧ ⑯ ⑮ ⑭ ⑬ ⑫ Before starting assembly, ensure that you have received all parts listed. * Packed within the back of the headboard. Box 1 Box 2 Description Description Part...
  • Page 3 ③ HARDWARE Part Diagram Description x 60mm Bolt x 45mm Bolt x 20mm Bolt x 60mm Bolt x 25mm Bolt M8 Washer Zinc Nut Adjustable Feet Base Lift Strap Plastic Centre Cap Plastic End Cap M6 Allen Key M8 Allen Key Spanner Corner Bracket 100 x 25mm EVA Pad...
  • Page 4 ④ H x 4pcs STEP 1 STEP 2 E x 8pcs Loosely attach the siderails to the headboard and footboard.
  • Page 5 ⑤ OPTION A STEP 3 LEFT HAND OPENING Q x 8pcs F x 4pcs B x 4pcs Q x 8pcs STEP 3 OPTION B F x 4pcs RIGHT HAND OPENING B x 4pcs...
  • Page 6 ⑥ B x 4pcs STEP 4 F x 8pcs G x 4pcs G x 3pcs STEP 5 A x 3pcs F x 6pcs x 1pcs...
  • Page 7 ⑦ B x 4pcs G x 4pcs STEP 6 F x 8pcs F x 4pcs P x 4pcs C x 8pcs STEP 7 ATTACH THE EVA PAD TO THE UNDERSIDE OF THE METAL TUBE...
  • Page 8 ⑧ STEP 8 ⑬ STEP 9 G x 4pcs...
  • Page 9 ⑨ STEP 10 D x 8pcs OPTION A LEFT HAND OPENING F x 8pcs ① STEP 10 D x 8pcs OPTION B F x 8pcs RIGHT HAND OPENING ①...
  • Page 10 ⑩ OPTION A STEP 11 C x 6pcs LEFT HAND OPENING STEP 11 OPTION B C x 6pcs RIGHT HAND OPENING...
  • Page 11 ⑪ STEP 12 J x 14pcs K x 28pcs FIRST DETAIL 1 THIRD DETAIL 3 SECOND DETAIL 2 COMPLETED !
  • Page 12 ⑫ ■ Retightening of all fixing periodically is recommended. ■ When moving your fully assembled bed you must first remove the mattress and lift the frame into position, take care when lifting and always have two people handling the bed. PLEASE DO NOT DRAG THE BED as this will cause damage to the rail.