fired water boiler
DIRECT VENT —
Determine location for air inlet elbow
1. The air inlet of an ECO Tec boiler is part of a direct vent
connection. It is not classified as a forced air intake with regard
to spacing from adjacent appliance terminations.
2. Locate the air inlet elbow (termination) using the following
guidelines.
3. The air piping must terminate in a down-turned elbow as shown
in Figure 49.
a. Apply the configuration on the left side of Figure 49 unless
the terminations would fail to meet minimum clearance to
grade or snow line.
b. Apply the configuration on the right side of Figure 49 when
the terminations need to be raised higher to meet clearance
to grade or snow line.
c. The air pipe may run up the side of the building, as shown.
The vent and air pipes must be secured with braces, and all
clearances and lengths must be maintained. Space braces no
further than 24 inches apart.
4. You must consider the surroundings when terminating the air
connection:
a. Make sure there are no obstructions for air flow. DO NOT
locate the termination where plants could grow and cause
obstruction to air flow.
b. Do not locate the terminations where wind eddies could affect
performance or cause recirculation with exhaust from other
appliances, such as inside building corners, near adjacent
buildings or surfaces, window wells, stairwells, alcoves,
courtyards or other recessed areas.
c. Locate the air inlet termination at least 12 inches below and 12
inches horizontally from any appliance or building vent outlet.
5. Locate terminations so they are not likely to be damaged by
foreign objects, such as stones or balls, or subject to buildup of
leaves or sediment.
Multiple air terminations
1. When terminating multiple ECO Tec boiler air connections,
terminate each air connection as described in this manual.
2. Place wall penetrations to obtain minimum clearances as
instructed in this manual.
3. Place adjacent air inlets for multiple ECO Tec boilers at least
6 inches apart.
4. For Canadian installations, provide clearances required by Natural
Gas and Propane Installation CAN/CSA B149.1 or B149.2
Installation Code.
Prepare wall penetrations
1. Air pipe penetration:
a. Cut a hole for the air pipe. Size the air pipe hole as close as
desired to the air pipe outside diameter.
2. Seal exterior openings thoroughly with exterior caulk.
Termination and fittings
1. Prepare the air termination elbow (Figure 49) by inserting a bird
screen. Bird screens must be purchased separately. See the parts
list at the end of this manual for part numbers.
2. Use metal plates (by installer) at inside and outside penetrations
using the method shown in Figure 28, page 29.
If extending the air pipe out from the wall, install a
coupling on each pipe. Mount the piping with the
coupling flush with the outer plate.
Part number 550-100-260/0520
80/110/150/199
Vertical vent /sidewall air
b
M
oiler
(continued)
Figure 48 Vent termination (through the roof) for
direct vent: vertical vent / sidewall air
Figure 49 Sidewall air inlet (termination) for
direct vent: vertical vent / sidewall air
anual
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecotec 110Ecotec 150Ecotec 199

Table of Contents