3. Plan the Installation

When installed, the back of the NJ2000 extends into a wall for 0.5 inches.
Because the depth of some wall openings differs, observe the following
requirements and recommendations before you install the NJ2000:
Make sure that the wall opening where the NJ2000 is being installed
complies with the NEMA-WD6 standard, as described in this diagram:
Make sure that the distance between the back of the NJ2000 and the
inside of the wall is at least 1.5 inches (3 inches is recommended).
NOTE: If you are installing the NJ2000 into a wall junction box, make sure that
there is enough space between the back of the NJ2000 and the inside of the
junction box to maintain an acceptable bend radius on the cable.
To ensure proper horizontal cabling functionality, adhere to the following
network cabling standards during installation:
ANSI/TIA/EIA-568
Commercial Building Telecommunications Cabling Standard
ANSI/TIA/EIA-569
Commercial Building Standard for Telecommunications Pathways and
Spaces