Installing The Control Unit; Vertical Din Rail Mounting - ABB BCU-02 Hardware Manual

Hide thumbs Also See for BCU-02:
Table of Contents

Advertisement

Installing the control unit

The control unit is grounded through the DIN rail.

Vertical DIN rail mounting

1. Attach the latches to the back of the control unit with four screws for each latch.
2. Push the control unit to the rail as shown below. It makes a click.
3. To prevent movement of the control unit, attach it to the rail with screws (a), or end
brackets (b), or both.
1
3a
Installation 17
1
2
2
3b

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bcu-12Bcu-22

Table of Contents