Installation; Fuse Replacement - ADJ Par ZP100 3K User Manual

Hide thumbs Also See for Par ZP100 3K:
Table of Contents

Advertisement

Par ZP100 3K
The unit should be mounted using a mounting clamp (not provided), affixing it to the mounting
bracket that is provided with the unit. Always ensure that the unit is firmly fixed to avoid vibration
and slipping while operating. Always ensure that the structure to which you are attaching the unit is
secure and is able to support at least 10 times the unit's weight. Also, always use a safety cable that
can hold 12 times the weight of the unit when installing the fixture.
The equipment must be installed by a professional, and it must be installed in a place where it is out
of the reach of people's grasp.
Par ZP100 3K
With this feature you can connect the fixtures to one another using the power input and output
sockets. The quantity that can be connected is as follows:
15 fixtures maximum @ 120V
25 fixtures maximum @ 230V
After these values are exceeded, additional power outlets will be needed to accommodate
additional devices.
NOTE: USE CAUTION WHEN POWER LINKING OTHER FIXTURES TO THE Par ZP100 3K AS
THE POWER CONSUMPTION OF OTHER LIGHTING FIXTURES WILL VARY!
Par ZP100 3K
Unplug the unit from any power source it may be connected to. Once the power has be discon-
nected, use a phillips head screw driver to unscrew the fuse holder located above the power input.
Remove the bad fuse and replace with a new one, and screw the fuse holder back in.
ADJ Products, LLC - www.adj.com - Par ZP100 3K User Manual Page 17

Installation

Unit Power Linking

Fuse Replacement

Advertisement

Table of Contents
loading

Table of Contents